← NRC enforcement actions

NRC CAL – NOV (White)

EA-17-203 · CAL · Issued 2018-02-22 · Reactor Licensees

Action

EA Number
EA-17-203
Licensee
NOV (White)
Category
Reactor Licensees
Action type
CAL
Date issued
2018-02-22

Description

On February 22, 2018, the NRC issued a Notice of Violation to Exelon Generation Company (Exelon) for a violation of Title 10 of the Code of Federal Regulations Part 50, Appendix B, Criterion XVI at Clinton Power Station, associated with a White Significance Determination Process finding. Contrary to the requirements, Exelon failed to assure that a condition adverse to quality was corrected. Specifically, Exelon failed to correct a degraded condition identified during an evaluation performed as a result of a Division 3 Shutdown Service Water pump failure in 2014. This failure resulted in a subsequent failure of the pump to run when tested in June 2017. Additionally, there are associated violations of Technical Specification 3.5.1, "ECCS-Operating," which requires High Pressure Core Spray (HPCS) to be restored to operable within 14 days and Technical Specification 3.7.2, "Division 3 Shutdown Service Water (SX) Subsystem" which requires HPCS to be declared inoperable immediately when SX is inoperable.

Source

Full letter
PDF on NRC ADAMS
NRC index
Reactor Licensees enforcement actions
Machine
JSON-LD · Markdown